Skip to content
Construction & Homecost

Home Renovation Cost Calculator

Renovation cost with bathrooms and the kitchen priced separately from the general area, because wet areas cost several times what a dry room does per square foot and averaging them across the flat hides the real driver.

Also called: home remodel cost, renovation budget calculator.

sqft
%
Renovation cost
₹14,49,000

₹14,49,000 for 1,200 square feet at the moderate scope, of which ₹1,89,000 is contingency. The general work is 1080000 at 900 a square foot for a moderate scope. Wet areas add 180000, which is 14% of the work before contingency, from a small fraction of the floor. Pricing them separately is what makes dropping one from the scope a decision the numbers can support. Contingency of 15% is higher than a new build would need, because opening up an existing structure finds problems rather than planning for them. Enter a rent figure if you will have to live elsewhere; six weeks is a real line item. Rates vary by city, season and contractor. Treat the figure as a budget with a stated contingency, not a quotation.

General work
₹10,80,000
Bathrooms
₹1,80,000
Kitchen
₹0
Contingency
₹1,89,000
Rent while displaced
₹0
Cost a square foot
₹1,208
Share taken by wet areas
14.3%
On the scope
The general work is 1080000 at 900 a square foot for a moderate scope. Wet areas add 180000, which is 14% of the work before contingency, from a small fraction of the floor. Pricing them separately is what makes dropping one from the scope a decision the numbers can support.
On living elsewhere
Contingency of 15% is higher than a new build would need, because opening up an existing structure finds problems rather than planning for them. Enter a rent figure if you will have to live elsewhere; six weeks is a real line item. Rates vary by city, season and contractor. Treat the figure as a budget with a stated contingency, not a quotation.

The estimate

ItemAmountShare
General work₹10,80,00074.5%
Bathrooms₹1,80,00012.4%
Kitchen₹00%
Contingency₹1,89,00013%
Living elsewhere₹00%
Method and background

How this is calculated

A single rate per square foot works badly for renovation because the cost is not spread evenly. A bathroom involves waterproofing, plumbing, tiling and fittings in a very small area, so it costs several times the per-foot rate of a bedroom, and a kitchen the same again. Pricing them separately makes the estimate both more accurate and more useful, since dropping one bathroom from the scope is a decision the numbers can now support. Renovation contingency runs higher than new build, fifteen to twenty percent, because opening up an existing structure reveals problems a new site does not have. Displacement is the cost people forget entirely: six weeks of rent elsewhere is a real line item.

general work scaled by scope, plus the wet areas priced separately because they cost several times the rate of a dry room
B
Bathrooms
K
Kitchen
c
Contingency

Worked examples

Each of these is asserted on every build. If a change to the engine ever moved one of these answers, the build would fail before the page could print it.

a moderate renovation of 1,200 square feet

Area being renovated
1,200 sqft
Scope
Moderate, flooring and one wet area
Base renovation rate a square foot
₹900
Bathrooms being redone
1
Cost a bathroom
₹1,80,000
Kitchens being redone
0
Cost a kitchen
₹3,50,000
Contingency
15%
Weeks you cannot live there
6
Rent while displaced
₹0

Renovation cost₹14,49,000

1200 x 900, plus one bathroom, plus 15%

Open this example

a cosmetic scope costs less than half

Area being renovated
1,200 sqft
Scope
Cosmetic, paint and fittings
Base renovation rate a square foot
₹900
Bathrooms being redone
0
Cost a bathroom
₹1,80,000
Kitchens being redone
0
Cost a kitchen
₹3,50,000
Contingency
15%
Weeks you cannot live there
0
Rent while displaced
₹0

Renovation cost₹5,58,900

boundary: scope moves the answer more than any rate does

Open this example

Method and limits

What it assumes

  • Rates covering material and labour for the scope selected.

What it deliberately does not model

  • Old wiring, plumbing and damp are discovered rather than planned for, which is what the contingency exists for.
  • Society or building permissions and restricted working hours can extend the timeline and the cost.

Formula version 1.0.0 · definition 1.0.0 · India · Report a problem with this calculator

Frequently asked questions

Why price bathrooms separately?
Because waterproofing, plumbing, tiling and fittings concentrate a lot of cost into a very small area. Spreading that across the whole flat as a per-foot rate hides what is actually driving the budget.
Why is renovation contingency higher than new build?
Because you are opening up something already built. Old wiring, hidden damp and non-standard construction are found, not planned, and fifteen to twenty percent is the honest allowance.